Home > Study in NIRT > Content
Comprehensive Training Room for Maintenance and Operation of Urban Rail Vehicle
Source: Date:2022/04/08 Views:

1.  Main Functions

     Based on the curriculum standards of the core courses of urban rail vehicles, such as "Maintenance and Overhaul of mechanical devices of urban rail vehicles", "Maintenance and Overhaul of motor and electrical appliances of urban rail vehicles", "Maintenance and Overhaul of control system of urban rail vehicles", "Maintenance and Overhaul of braking system of urban rail vehicles", the training room can carry out corresponding training on maintenance and overhaul skills of vehicle systems and components.

     Through the recognition and operation control of the structural principles and subsystems of urban rail vehicle driver's bridge, pantograph, bogie, traction system, braking system, network control system, electrical cabinet, door, coupler and air conditioning device, It can clearly display the operation process of urban rail vehicle driver's cab driving, pantograph lifting, traction driving, friction braking, electrical control, passenger room door switch, coupler connection and air-conditioning cooling and heating, and enables students to understand understand and master the structure composition and working principle of the main components of urban rail vehicle.

In the training teaching, remote and local operation control drills can be carried out, and fault settings can also be carried out to assess students' ability to eliminate vehicle system faults, so that students can master the professional skills of key posts of urban rail vehicle maintenance and overhaul.

2.  Main Equipment

    1 set of splicing display system , 1 set of the driver room training system, 1 set of trailer train bogie bogie, 1 set of pantograph, 1 set of cab electrical cabinet , 2 sets of electrical cabinets in passenger compartment (vehicles A and B), 2 sets of brake control unit (Motor car and trailer car), 1 set of relay control cabinet, 1 set of brake valves and compressed air pipeline system1 set of the train network control system, 1 set of traction braking system, 1 set of door system, 1 set of coupler system, 1 set of air conditioning system, 1 set of lighting control system, 1 set of passenger information system, 4 sets of local operating control system, 1 set of air braking multimedia interactive teaching software system, 1 set of traction braking multimedia interactive teaching software1 set of multimedia interactive teaching software system for passenger compartment door, 1 set of multimedia interactive teaching software system for control circuit principle.

3.  Main Training Projects

    (1) Operation training in driver's cab

    (2) Comprehensive practical training of electrical cabinet

    (3) Pantograph comprehensive training

    (4) Bogie comprehensive training

    (5) Comprehensive training of traction system

    (6) Comprehensive training of air braking system

    (7) Comprehensive practical training of guest room door

    (8) Comprehensive practical training of coupler

    (9) Comprehensive training of vehicle air conditioning

1172.jpg

CC4C0AFACC4BFB35172903102F5D0348.jpg

1144.jpg


 

Previous:Urban Rail Vehicle Control System Training Room
Next:Vehicle Maintenance Training Room