Home > Study in NIRT > Content
Urban Rail Vehicle Control System Training Room
Source: Date:2022/04/08 Views:

1. Main Functions

According to the core courses of urban rail vehicle "Urban Rail Vehicle Control System Maintenance and Overhaul" and "Urban Rail Vehicle Operation and Regulations", carrying out corresponding practical training. By controlling the experimental platform of urban rail vehicle control system, it can clearly display the operation process of urban rail vehicle door switch, pantograph lifting, train braking and other related parts. Through the operation of the comprehensive simulation operation system of urban rail vehicles, the contents and operation specifications of the inbound and outbound operation, forward operation and turn-back operation of the train can be displayed. Train fault setting can be carried out in teaching, and students' ability of troubleshooting control system faults and emergency handling of train faults during operation can be assessed, so that students can master the professional skills of key positions of urban rail vehicle maintenance personnel and urban rail vehicle drivers.

2. Main Equipment

(1)  Two training devices for urban rail vehicle door system;

(2)  Two sets of urban rail vehicle control system training devices;

(3)  Two sets of urban rail vehicle comprehensive simulation operation system;

3. Main Training Projects

(1)  Adjustment and debugging of urban rail vehicle passenger compartment door system;

(2)  Urban rail vehicle simulation driving training;

(3)  Maintenance and training of urban rail vehicle control system;

(4)  Urban rail vehicle simulation operation training.

 

 

 

Previous:Locomotive and Rolling Stock Network Simulation
Next:Comprehensive Training Room for Maintenance and Operation of Urban Rail Vehicle